{"id":39,"date":"2016-07-19T07:13:01","date_gmt":"2016-07-19T07:13:01","guid":{"rendered":"https:\/\/beaufortinvestmentgroup.ae\/dubai\/?page_id=39"},"modified":"2016-08-03T04:46:39","modified_gmt":"2016-08-03T04:46:39","slug":"infrastructure","status":"publish","type":"page","link":"https:\/\/beaufortinvestmentgroup.ae\/dubai\/infrastructure\/","title":{"rendered":"INFRASTRUCTURE"},"content":{"rendered":"<div class=\"row\" style=\"position:relative;\">\n<div class=\"col-md-8\"><img decoding=\"async\" src=\"\/wp-content\/images\/YAS-F1-01.jpg\" style=\"width:100%\" \/><\/div>\n<div class=\"mypage-bottom col-md-4\">\n<span class=\"mypage-header\">Yas Island Formula1 Track<\/span><br \/>\n<span class=\"mypage-tag\">Civil Works \u2013 Abu Dhabi<\/span><br \/>\n<span class=\"mypage-detail\">Major civil works and track upgrades were completed between meetings and completed to host the F1, The full circuit length is 5.554 km and can be configured in five different ways to accommodate a variety of motorsport events. Yas Marina Circuit is the only motorsports venue in the world that offers covered and shaded grandstands throughout the facility, coupled with unique pit lanes that run partially beneath the track.<\/span><br \/>\n<span class=\"mypage-footer\">Project time 1 year<\/span>\n<\/div>\n<\/div>\n<div class=\"row\">\n<div class=\"col-md-12\" style='padding-top:20px;'><\/div>\n<div class=\"col-md-6\">\n<img decoding=\"async\" src=\"\/wp-content\/images\/Infrastructure_Al-Rahba-01.jpg\" \/><br \/>\n<span class=\"mypage-header\">Al Rahba City<\/span><br \/>\n<span class=\"mypage-tag\">Construction of Internal Roads and Services \u2013 Abu Dhabi.<\/span><br \/>\n<span class=\"mypage-detail\">Construction of the internal roads and drainage under a civil works contract for this large scale city satellite in Abu Dhabi. Timing and prompt execution of works were the main criteria and performed with in time.<\/span><br \/>\n<span class=\"mypage-footer\">Project time: 1.8 years<\/span>\n<\/div>\n<div class=\"col-md-6\">\n<img decoding=\"async\" src=\"\/wp-content\/images\/Infrastructure_Al-Barsha-01.jpg\" \/><br \/>\n<span class=\"mypage-header\">Al Barsha South<\/span><br \/>\n<span class=\"mypage-tag\">Sewage and Drainage System Phase 1 \u2013 Dubai.<\/span><br \/>\n<span class=\"mypage-detail\">Extensive upgrading of the civil works and infra structure to allow the major residential construction in the area to be able to utilize the new subsystems in place. A major civil works project done with minimal disruption to existing residences and infra structure.<\/span><br \/>\n<span class=\"mypage-footer\">Project Time: 2 years<\/span>\n<\/div>\n<\/div>\n<div class=\"row\">\n<div class=\"col-md-12\" style='padding-top:20px;'><\/div>\n<div class=\"col-md-6\">\n<img decoding=\"async\" src=\"\/wp-content\/images\/Infrastructure_Al-Sufouh-01.jpg\" \/><br \/>\n<span class=\"mypage-header\">Al Sufouh Light Rail Project<\/span><br \/>\n<span class=\"mypage-tag\">Metro Civil Works &#8211; Dubai.<\/span><br \/>\n<span class=\"mypage-detail\">The Dubai Tram project, which was formerly known as Al Sufouh Tram Project, is a 14.6km-long route that mainly follows the Al Sufouh Road, linking Madinat Jumeirah and the Mall of the Emirates with Dubai Marina and the Jumeirah Beach Residence. The tram will serve 27,000 daily passengers initially and the ridership is expected to increase to 66,000 by 2020.<\/span><br \/>\n<span class=\"mypage-footer\">Project time: 2.5 years<\/span>\n<\/div>\n<div class=\"col-md-6\">\n<img decoding=\"async\" src=\"\/wp-content\/images\/Infrastructure_Bluewater-01.jpg\" \/><br \/>\n<span class=\"mypage-header\">Access to Blue water Island<\/span><br \/>\n<span class=\"mypage-tag\">Overpass and Roadworks \u2013 Dubai.<\/span><br \/>\n<span class=\"mypage-detail\">Major entry road, internal roads and bridge to this magnificent man-made island paradise. Coping with access issues from the main land all materials were man handled to allow the completion of this project.<\/span><br \/>\n<span class=\"mypage-footer\">Project Time: 1 year<\/span>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Yas Island Formula1 Track Civil Works \u2013 Abu Dhabi Major civil works and track upgrades were completed between meetings and completed to host the F1, The full circuit length is 5.554 km and can be configured in five different ways to accommodate a variety of motorsport events. Yas Marina Circuit is the only motorsports venue &hellip; <a href=\"https:\/\/beaufortinvestmentgroup.ae\/dubai\/infrastructure\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;INFRASTRUCTURE&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page_dubai.php","meta":{"footnotes":""},"class_list":["post-39","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/beaufortinvestmentgroup.ae\/dubai\/wp-json\/wp\/v2\/pages\/39"}],"collection":[{"href":"https:\/\/beaufortinvestmentgroup.ae\/dubai\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/beaufortinvestmentgroup.ae\/dubai\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/beaufortinvestmentgroup.ae\/dubai\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/beaufortinvestmentgroup.ae\/dubai\/wp-json\/wp\/v2\/comments?post=39"}],"version-history":[{"count":0,"href":"https:\/\/beaufortinvestmentgroup.ae\/dubai\/wp-json\/wp\/v2\/pages\/39\/revisions"}],"wp:attachment":[{"href":"https:\/\/beaufortinvestmentgroup.ae\/dubai\/wp-json\/wp\/v2\/media?parent=39"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}