INFRASTRUCTURE
Yas Island Formula1 Track
Civil Works – Abu Dhabi
Major civil works and track upgrades were completed between meetings and completed to host the F1, The full circuit length is 5.554 km and can be configured in five different ways to accommodate a variety of motorsport events. Yas Marina Circuit is the only motorsports venue in the world that offers covered and shaded grandstands throughout the facility, coupled with unique pit lanes that run partially beneath the track.
Project time 1 year

Al Rahba City
Construction of Internal Roads and Services – Abu Dhabi.
Construction of the internal roads and drainage under a civil works contract for this large scale city satellite in Abu Dhabi. Timing and prompt execution of works were the main criteria and performed with in time.
Project time: 1.8 years

Al Barsha South
Sewage and Drainage System Phase 1 – Dubai.
Extensive upgrading of the civil works and infra structure to allow the major residential construction in the area to be able to utilize the new subsystems in place. A major civil works project done with minimal disruption to existing residences and infra structure.
Project Time: 2 years

Al Sufouh Light Rail Project
Metro Civil Works – Dubai.
The Dubai Tram project, which was formerly known as Al Sufouh Tram Project, is a 14.6km-long route that mainly follows the Al Sufouh Road, linking Madinat Jumeirah and the Mall of the Emirates with Dubai Marina and the Jumeirah Beach Residence. The tram will serve 27,000 daily passengers initially and the ridership is expected to increase to 66,000 by 2020.
Project time: 2.5 years

Access to Blue water Island
Overpass and Roadworks – Dubai.
Major entry road, internal roads and bridge to this magnificent man-made island paradise. Coping with access issues from the main land all materials were man handled to allow the completion of this project.
Project Time: 1 year