Dredging of approximately 1.2 million cubic meters.
Design, construction and dredging for a boat harbour and entrance channel.
Dredging operations including the design and construction of dredge bunds pipeline.
Dredging to increase the depth of a shipping channel in Darwin, NT.
Dredging of approximately 700,000m3 from the Darwin Marine Base.
Dredging of 500,000m3 from the approach channel for a popular tourist port.
Dredging and land reclamation for the expansion of the Port of Brisbane.
Dredging from Ross River including the design and construction of dredge bunds.
Improvement of navigational accessibility from the South Paray Wharf to Iririki Island.
Delivery of dredging operations for the Department of Transport and Main Roads.